Skip to product information
1 of 1

Dogs and Horses

D&H Rolled Soft Leather Adjustable Long Lead Purple

D&H Rolled Soft Leather Adjustable Long Lead Purple

Regular price £130.00 GBP
Regular price Sale price £130.00 GBP
Sale Sold out
Taxes included.
Fittings
Size
Quantity

Sometimes called the Police Dog Lead or simply Training Lead. It's used historically by police and army dog handlers (the different length settings vary depending on type of patrol or pursuit). The Adjustable Training Lead is now much sought-after by dog owners who appreciate its versatility.

Ideal for the multi-tasking dog owner. Perhaps you're a parent pushing a pram and walking the dog at the same time. Perhaps you're a runner and want your dog to tag along hands-free. Or maybe you're glad to adjust the lead to its full length of about 7-feet to give your dog more room to roam on its walk. It's also brilliant for securing your dog to a park bench, or a pub table, when you stop for a rest or refreshment.

 
The internal rope is made for sheet and halyard use by yachtsmen - which means it won't rot if it gets wet, and has excellent strength and durability and a tensile strength into the thousands of pounds.
 
 
Total length is approx 7-feet at its longest (create a handle at one end). But the lead can be adjusted to throw over your shoulder or secure around your waist. Can also be configured to a standard length of about 1-metre.
 
You'll notice the lead also features two trigger hooks so you can actually use it for two dogs. Most dog owners, professional handlers and dog walkers appreciate the hands-free option.

    Available now in ALL classic and contemporary colours, although not images ready yet (we're working on that).*

    * IF you have a special request, please ring us on 020 7018 0175 or email hello@dogsandhorses.co.uk 

     

    Materials

    Shipping & Returns

    Dimensions

    Care Instructions

    View full details

    Image with text

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

    • Free Shipping

      Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

    • Hassle-Free Exchanges

      Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.